This site is really starting to become a home construction area instead of just removing tons of rock and making walls with it. We’ve got the poured walls for the basement up and water proofed. The rough-in plumbing is in place and we’ve back filled up to the poured walls. Next up will be the foundation getting poured and the beginning of framing.

Poured walls with water proofing and staked out rough in plumbing.

Water proofing being added to the poured walls.

Plumbing on the inside of the poured walls before the foundation in poured on top.

Wall forms holding the poured concrete to form the poured walls.

Extensive view of the wall forms in place.

The concrete poured walls drying in the wall forms.

An up close view of the poured walls in the forms.

Back filling around the poured walls after water proofing them.