This site is really starting to become a home construction area instead of just removing tons of rock and making walls with it. We’ve got the poured walls for the basement up and water proofed. The rough-in plumbing is in place and we’ve back filled up to the poured walls. Next up will be the foundation getting poured and the beginning of framing.

20180130_122718

Poured walls with water proofing and staked out rough in plumbing.

20180130_123118

Water proofing being added to the poured walls.

20180130_123126

Plumbing on the inside of the poured walls before the foundation in poured on top.

BT_1516995455796

Wall forms holding the poured concrete to form the poured walls.

BT_1516995547935

Extensive view of the wall forms in place.

BT_1516995554301

The concrete poured walls drying in the wall forms.

BT_1516995564087

An up close view of the poured walls in the forms.

IMG_7200

Back filling around the poured walls after water proofing them.