Month: March 2018
Timberbrook-Keowee-7
March 27, 2018
No Comments
The poured walls are all waterproofed and set. We’ve got rough-in plumbing all run and we’ve back-filled the entire area with earth.
Creating a Home vol 23
March 21, 2018
No Comments
Volume 23 of great spaces in our homes.
Rippling Cove-Keowee-7
March 20, 2018
No Comments
Framing of the basement and burying of the septic tanks has given the landscape a finished look. The views are spectacular.
Creating a Home vol 22
March 14, 2018
No Comments
Volume 22 of great spaces in our homes.
Tammerick-Hartwell-6
March 13, 2018
No Comments
The basement is all framed with the floor for the main level above. The main level framing is going up and you can see the house taking shape.
Creating a Home vol 21
March 7, 2018
No Comments
Volume 21 of great spaces in our homes.
Little Lightwood-Hartwell-6
March 6, 2018
No Comments
The second story is taking shape. Framing and exterior walls are almost finished