Rippling Cove-Keowee-7

This home has a foundation now and the framing of the basement and burying of the septic tanks has given the landscape a finished look. The views are spectacular.

 

20180213_163429
Straw is placed to help grass seed take hold and you can see the basement framing going up.
20180213_163436
More straw and bales of hay to keep all the dirt in place now that it’s been graded and drainage has been added.
20180213_165110
Septic tank caps and all the septic tanks have been buried and the dirt covered with straw.
20180213_165118
All the grading finished and covered.
20180214_155028
Framing of the basement. You can see the walls taking shape.

[wpvideo f5gi3Ky0]

Framing of the basement showcasing the door and window placements.

BT_1518556706188
The great view that’ll be had from here is going to be lovely.
framing
The lake all framed out by the basement walkout.

Leave a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Archives

Categories

Subscribe

Sign up for our Newsletter

Fill out my online form.