Month: August 2019
Creating a Home vol 94
Volume 94 of great spaces in our homes.
Dobbs Landing-Hartwell-3
We’ve got the double garage door has been installed, tile for the showers has been completed and wood trim details are getting finished all over.
Creating a Home vol 93
Volume 93 of great spaces in our homes.
Kings Bench-Hartwell-3
This home is having tile, railings, appliances, the glass shower door and hardwood installed.
Creating a Home vol 92
Volume 92 of great spaces in our homes.
Rippling Cove-Keowee-25
This home is becoming more and more beautiful as all the finishing design elements come together. We’ve got fireplace mantles, cabinetry, granite countertops, tile work, electrical and mirrors being installed.
Creating a Home vol 91
Volume 91 of great spaces in our homes.
Early-Hartwell-2
This remodel is making progress. We’ve got more demo going on in the living room. The car port has gotten columns and a metal roof. While the exterior has gotten siding and stonework. New windows and a fireplace have been installed.