This addition is being framed, having windows and doors installed, the HVAC installed and the soffit being added to the roof tie-ins.
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/1-framing-1.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/2-ext-framing.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/3-front-porch-framing.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/4-fireplace-framing.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/5-window-install.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/6-door-install.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/7-HVAC-install.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/8-ext-fireplace.jpg)
This addition is being framed, having windows and doors installed, the HVAC installed and the soffit being added to the roof tie-ins.