Tammerick-Hartwell-6

The basement is all framed with the floor for the main level above. The main level framing is going up and you can see the house taking shape. The layout is apparent and next up will be the loft level with roofing going on.

Framing of 1st floor
Main level framing going up.
Main floor above basement
The floor for the main level is ready to receive framing.
Main Floor beginning
The beginning of the main floor framing.
Main floor subfloor
The sub-floor is all in place for the main level.
pored walls with framing above
Poured walls on the basement level with main level framed walls above.
rear framing
Rear framing with the screened-in porch starting to take shape.
taking shape
The main level taking shape, you can see window and door placement.
Walls on main
Walls being formed on the main level.

Leave a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Archives

Categories

Subscribe

Sign up for our Newsletter

Fill out my online form.