This site is really starting to become a home construction area instead of just removing tons of rock and making walls with it. We’ve got the poured walls for the basement up and water proofed. The rough-in plumbing is in place and we’ve back filled up to the poured walls. Next up will be the foundation getting poured and the beginning of framing.

20180130_122718
Poured walls with water proofing and staked out rough in plumbing.
20180130_123118
Water proofing being added to the poured walls.
20180130_123126
Plumbing on the inside of the poured walls before the foundation in poured on top.
BT_1516995455796
Wall forms holding the poured concrete to form the poured walls.
BT_1516995547935
Extensive view of the wall forms in place.
BT_1516995554301
The concrete poured walls drying in the wall forms.
BT_1516995564087
An up close view of the poured walls in the forms.
IMG_7200
Back filling around the poured walls after water proofing them.

Leave a Comment

Your email address will not be published. Required fields are marked *

Subscribe

Sign up for our Newsletter

Fill out my online form.