The home has taken on the features that make it a house. Plumbing, windows, HVAC and waterproofing in preparation for shingles on the roof.

20180517_135711

Here you can see a bath tub being installed with the plumbing set in place for a shower as well, all of this done before we install the tile.

20180524_132237

The windows getting all trimmed out on the exterior.

20180524_132336

The great room fireplace is having the HVAC connected to it.

20180524_132350

The screened-in porches fireplace has HVAC and the sealed zip system wrap installed on it before stone is added.

BT_1524687139981

The roof is all prepped for the shingles to go on now.

BT_1525373755525

Windows being installed and you can see all the lovely natural light coming in.

BT_1525373785592

The same windows from the exterior that let in all the natural light.

[wpvideo g8Ybmi20]

An inspection of the window installation.