The home has taken on the features that make it a house. Plumbing, windows, HVAC and waterproofing in preparation for shingles on the roof.

20180517_135711
Here you can see a bath tub being installed with the plumbing set in place for a shower as well, all of this done before we install the tile.
20180524_132237
The windows getting all trimmed out on the exterior.
20180524_132336
The great room fireplace is having the HVAC connected to it.
20180524_132350
The screened-in porches fireplace has HVAC and the sealed zip system wrap installed on it before stone is added.
BT_1524687139981
The roof is all prepped for the shingles to go on now.
BT_1525373755525
Windows being installed and you can see all the lovely natural light coming in.
BT_1525373785592
The same windows from the exterior that let in all the natural light.

[wpvideo g8Ybmi20]

An inspection of the window installation.

Leave a Comment

Your email address will not be published. Required fields are marked *

Subscribe

Sign up for our Newsletter

Fill out my online form.