Timberbrook-Keowee-11

The home is visibly a home now. All the framing is going on. You can see the walls of the main floor, the loft and the roof taking shape.

20180323_101244
The main level all framed in with sheathing on the exterior.
20180323_102755
Framing has begun on the main level.
20180323_102821
Wall framing with the windows cut into it.
20180328_084001
You can see the whole main floor in this picture being framed.
BT_1522352019906
This gives you a closer look at the framing for the loft area.
BT_1522348335694
This pictures shows the roof beginning to be framed in.
20180413_144307
An interior shot of the roof line.
20180411_120902
This is the screened-in porch being framed.

Leave a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Archives

Categories

Subscribe

Sign up for our Newsletter

Fill out my online form.