The framing is almost complete and the cabinetry is being drawn on the subfloor to ensure that everything will be in the proper place for plumbing and electrical.

The cabinets are being drawn out on the subfloor to ensure that everything fits.

The stairwell all framed with more cabinetry drawn on the wall to the left.

The loft area getting framed and the subfloor beginning.

The screened in porch with stone exterior.

Sheetrock starting with doors being hung.

More cabinetry drawn out and a glimpse of the view of the lake.

This is where the kitchen will be with a window over the sink.

The lay out of the master bathroom.