The home is getting many touches to finish the look. Wood and stone on the exterior, T&G for the ceilings and tile in the master bath.

20180411_095354

The exterior is getting the wood trim and stone work details that make this home a craftsman.

20180411_095808

The deck railings are being installed and will get pickets next.

IMG_0105.HEIC

The rear os the home showing the deck in progress.

IMG_0215.HEIC

T&G ceilings are going in the hallway.

IMG_0254.HEIC

The great room is getting T&G on the vaulted ceiling.

IMG_0300.HEIC

The columns are getting topped with crown molding before they are painted.

IMG_0669.HEIC

The tile for the bathroom looks like petrified wood, lovely.

IMG_0675.HEIC

The barn door has been stained in a dark finish and hung in the master.