The home is getting many touches to finish the look. Wood and stone on the exterior, T&G for the ceilings and tile in the master bath.

20180411_095354
The exterior is getting the wood trim and stone work details that make this home a craftsman.
20180411_095808
The deck railings are being installed and will get pickets next.
IMG_0105.HEIC
The rear os the home showing the deck in progress.
IMG_0215.HEIC
T&G ceilings are going in the hallway.
IMG_0254.HEIC
The great room is getting T&G on the vaulted ceiling.
IMG_0300.HEIC
The columns are getting topped with crown molding before they are painted.
IMG_0669.HEIC
The tile for the bathroom looks like petrified wood, lovely.
IMG_0675.HEIC
The barn door has been stained in a dark finish and hung in the master.

Leave a Comment

Your email address will not be published. Required fields are marked *

Subscribe

Sign up for our Newsletter

Fill out my online form.