The house is really beginning to look like a home. We’ve installed windows to look out on that fabulous view of the lake. The siding has gone up on the exterior and the roof is finished being shingled. The fireplace is all trimmed out and has HVAC installed for it in preparation for the stone work to begin.

Prepping for a triple window install.

Installing the triple window.

The triple windows all installed and trimmed out.

This shows the HVAC for the fireplace getting installed.

The fireplace box has been all trimmed out and protected before the stone work begins.

We’ve got siding going up on the exterior along with trim work.

All the finishing trim is being added along the edges of the siding.

The siding is almost completed and the roof all shingled as well.