Tammerick-Hartwell-11

The house is really beginning to look like a home. We’ve installed windows to look out on that fabulous view of the lake. The siding has gone up on the exterior and the roof is finished being shingled. The fireplace is all trimmed out and has HVAC installed for it in preparation for the stone work to begin.

1-ready for triple window
Prepping for a triple window install.
2-20171219_114328
Installing the triple window.
3-20171219_113307
The triple windows all installed and trimmed out.
4-fireplace hvac
This shows the HVAC for the fireplace getting installed.
5-fireplace trim
The fireplace box has been all trimmed out and protected before the stone work begins.
6-20171226_105812
We’ve got siding going up on the exterior along with trim work.
7-20171226_105712
All the finishing trim is being added along the edges of the siding.
8-BT_1515184205124
The siding is almost completed and the roof all shingled as well.