The house is really beginning to look like a home. We’ve installed windows to look out on that fabulous view of the lake. The siding has gone up on the exterior and the roof is finished being shingled. The fireplace is all trimmed out and has HVAC installed for it in preparation for the stone work to begin.
Tammerick-Hartwell-11
Recent Posts
Lightwood-Hartwell-5
March 31, 2020
Creating a Home vol 122
March 25, 2020
Lightwood 2-Hartwell-1
March 24, 2020