Rue Cezzan-Hartwell-1

We’ve got a new home addition that we’re starting. Come checkout the early preparations.

We’re breaking up the old driveway and parking area to make space for the new addition.
We’ve dug out the earth to level out the area in preparation for the footers.
We’re also putting in a pool. This will be the layout.
The footers for the new walls have been poured.
The concrete walls for the new addition have been poured on top of the footers.
We’ve broken up the existing foundation to connect to the existing plumbing and run it to the new addition.
The old poured walls have been cut to enable access to the addition from the basement area.
The demo of the existing exterior where the addition will connect has begun.