We’re working on the final framing of the basement with white oak timbers being delivered and trimmed for install. The main level will be started soon.

Here we are pumping water from the lower section of the basement.

Truss and beam delivery for the floor system of the main level.

White oak beams being delivered.

Taking the large white beams down the gravel driveway.

Adding treated plywood to the exterior.
[wpvideo U04nirXD]
A walk through the framing.

A view of the framing from above.
[wpvideo KtIcJrkN]
White oak timber trimming in preparation for installation.