We’re working on the final framing of the basement with white oak timbers being delivered and trimmed for install. The main level will be started soon.
![20180226_101925](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180226_101925.jpg)
![20180227_123039](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180227_123039.jpg)
![20180302_135939](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180302_135939.jpg)
![20180302_142623](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180302_142623.jpg)
![20180305_152714](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180305_152714.jpg)
[wpvideo U04nirXD]
A walk through the framing.
![BT_1519851810231](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/BT_1519851810231.jpg)
[wpvideo KtIcJrkN]
White oak timber trimming in preparation for installation.