Rippling Cove-Keowee-8

We’re working on the final framing of the basement with white oak timbers being delivered and trimmed for install. The main level will be started soon.

20180226_101925
Here we are pumping water from the lower section of the basement.
20180227_123039
Truss and beam delivery for the floor system of the main level.
20180302_135939
White oak beams being delivered.
20180302_142623
Taking the large white beams down the gravel driveway.
20180305_152714
Adding treated plywood to the exterior.

[wpvideo U04nirXD]

A walk through the framing.

BT_1519851810231
A view of the framing from above.

[wpvideo KtIcJrkN]

White oak timber trimming in preparation for installation.