We’re working on the final framing of the basement with white oak timbers being delivered and trimmed for install. The main level will be started soon.

20180226_101925

Here we are pumping water from the lower section of the basement.

20180227_123039

Truss and beam delivery for the floor system of the main level.

20180302_135939

White oak beams being delivered.

20180302_142623

Taking the large white beams down the gravel driveway.

20180305_152714

Adding treated plywood to the exterior.

[wpvideo U04nirXD]

A walk through the framing.

BT_1519851810231

A view of the framing from above.

[wpvideo KtIcJrkN]

White oak timber trimming in preparation for installation.