Rippling Cove-Keowee-30

We’re getting last minute details all wrapped up.

The under cabinet lighting has been installed. The glow on the granite is lovely.
Shrubbery has hay spread around for ground cover and warmth for the plants.
Sod has been laid all along the slopes.
The Gym is these beautiful timber framed mirrors all around the room.
The Gym flooring has been installed, all ready for a workout.
The wet bar has gotten floating shelves that also have led lighting.
The driveway is finished in paver stones that are almost completed.
The retaining wall is having landscaping completed all around it for a final lush look.