Rippling Cove-Keowee-15

The final white oak rafters are being installed and the framing is being completed. We’ve got sheathing on the exterior and roof. The windows and exterior doors have been delivered and are being installed. We’ve also started to do the custom finishes inside with an arched T&G ceiling in a hallway.

1-BT_1525366888453
White oak connector pieces for the large timbers being used.
2-20180509_153305
The arched rafters of white oak being put into place.
3-20180525_092533
The framing bein completed for the roof.
4-Sheething
The sheathing getting installed on the exterior.
5-Ext framing
More sheathing and roofing being installed.
6-Windows
Windows and door are being installed.
7-Arched T&G ceiling
A gorgeous arched ceiling being done in T&G.
8-patio doors
The double french doors that lead to the patio.

 

 