Rippling Cove-Keowee-13

We’ve got the garage being framed and tied into the home framing. White oak timbers are being delivered and those will make a huge impact in the design element of this home.

20180426_144859
The walls of the garage are being framed and raised into place.
20180428_111240
The garage is getting the roof framed and sheeting is being placed on the exterior.
20180430_155419
The roof is being framed for the garage.
20180501_141538
Timbers being delivered and stacked on the job site.

[wpvideo 5HCGt6tq]

A walk through showing the framing of the bonus room and loft area.

BT_1525366894981
Shaped white oak timbers to use as beams in the house.
BT_1525367060841
More white oak timbers all ready to be assembled for trusses.
BT_1525368197718
The main level is all framed and the floor system is in place for the loft and bonus room level.