The vaulted ceilings and timbers are in place. On the exterior we’ve added steel I beams in a framework with metal roofing on top. We’ve begun framing the garage as well.
![20180406_111748](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180406_111748.jpg)
![20180406_111814](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180406_111814.jpg)
![20180413_123745](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180413_123745.jpg)
![20180418_145453](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180418_145453.jpg)
![20180418_145844](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180418_145844.jpg)
![20180430_110105](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/20180430_110105.jpg)
![BT_1524681592266](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/BT_1524681592266.jpg)
![BT_1524681617279](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/BT_1524681617279.jpg)
The vaulted ceilings and timbers are in place. On the exterior we’ve added steel I beams in a framework with metal roofing on top. We’ve begun framing the garage as well.
Address
109 Railroad Street Hartwell, GA 30643
© 2024 Phillips Brothers Contracting Inc. All Rights Reserved. Admin Login. Powered by ShiftWeb. Privacy Policy