Rippling Cove-Keowee-12

The vaulted ceilings and timbers are in place. On the exterior we’ve added steel I beams in a framework with metal roofing on top. We’ve begun framing the garage as well.

20180406_111748
The framing for the vaulted ceiling really lets you feel how spacious the area will be.
20180406_111814
We’ve got all the doorways and window openings framed now.
20180413_123745
Steel I beams are set for the framework on the exterior.
20180418_145453
Metal ribbed roofing in set on top of the steel beam framing.
20180418_145844
This shows the underside of the metal and steel framework.
20180430_110105
The exterior walls are getting sheathed.
BT_1524681592266
The back of the house facing the lake is going to be extraordinary.
BT_1524681617279
Framing of the garage going on as well.