Little Lightwood-Hartwell-9

This home is really becoming a beautiful thing. They’ve been pouring the path to the dock, building the deck and putting up the siding with the wood trim. It’s going to be very lovely when it’s all finished.

20180109_101300
We’ve been pouring the concrete path to the dock.
20180109_101707
The siding is going up beautifully.
20180109_101745
The deck extends from the garage to the rear of the house.
20180109_101939
The extensive deck being built to enjoy the lake from.
20180109_101957
The roof extension will offer shelter from the rain and shade from the sun.
BT_1515520850403
A smooth path to the dock.
BT_1515520887870
Trim work going up on the exterior of the house.
IMG_8434.HEIC
The garage getting the same trim for the siding that the rest of the home will have.

Leave a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Archives

Categories

Subscribe

Sign up for our Newsletter

Fill out my online form.