The framing is all set and now we’re insulating and getting all the plumbing finished up. Installing tubs before we start to put up drywall and tile is a part of that. We’re also getting the siding and decking up and ready to paint or stain. It’s really beginning to look like a home.

Insulation going up in the loft area above the kitchen.

We’ve got a cast iron tub being installed before drywall and tile go up.

A wrap around deck to enjoy the lake views from.

The framing of the deck is looking very lovely.

Plumbing and electrical being run in the basement

All set to install the wet bar for the basement now.

The under side of the structure of the exterior decking before it gets a T&G finish.

Trimming out the siding on the walk out basement level.