The framing is all set and now we’re insulating and getting all the plumbing finished up. Installing tubs before we start to put up drywall and tile is a part of that. We’re also getting the siding and decking up and ready to paint or stain. It’s really beginning to look like a home.

20180108_143843

Insulation going up in the loft area above the kitchen.

20180109_102337

We’ve got a cast iron tub being installed before drywall and tile go up.

Deck in progress

A wrap around deck to enjoy the lake views from.

Decking 2

The framing of the deck is looking very lovely.

IMG_8346.HEIC

Plumbing and electrical being run in the basement

IMG_8368.HEIC

All set to install the wet bar for the basement now.

Porch ceiling in progress

The under side of the structure of the exterior decking before it gets a T&G finish.

Trim around windows and doors

Trimming out the siding on the walk out basement level.