Little Lightwood-Hartwell-8

The framing is all set and now we’re insulating and getting all the plumbing finished up. Installing tubs before we start to put up drywall and tile is a part of that. We’re also getting the siding and decking up and ready to paint or stain. It’s really beginning to look like a home.

20180108_143843
Insulation going up in the loft area above the kitchen.
20180109_102337
We’ve got a cast iron tub being installed before drywall and tile go up.
Deck in progress
A wrap around deck to enjoy the lake views from.
Decking 2
The framing of the deck is looking very lovely.
IMG_8346.HEIC
Plumbing and electrical being run in the basement
IMG_8368.HEIC
All set to install the wet bar for the basement now.
Porch ceiling in progress
The under side of the structure of the exterior decking before it gets a T&G finish.
Trim around windows and doors
Trimming out the siding on the walk out basement level.

Leave a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Archives

Categories

Subscribe

Sign up for our Newsletter

Fill out my online form.