Little Lightwood-Hartwell-14

This home is getting the finishing custom touches the really define the house as a home. Tile, wood work and all the finishing details are being added.

20180307_092457
The pantry shelving is all trimmed with a finishing edge on the granite and wooden shelves.
20180307_092547
The master bath has floating shelves all ready for stain.
20180307_092557
The linen shelves are all finished and painted.
IMG_9391.HEIC
The mud room has a charming custom cubby with a T&G back over a bench storage seat.
IMG_9396.HEIC
The shower niche tile is all finished and looks fabulous.
IMG_9419.HEIC
All the beams are in place and ready to be stained.
IMG_9432.HEIC
The stairs to the loft are getting the railing installed.
IMG_9433.HEIC
The wood column is all trimmed out and ready for stain.

Leave a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Archives

Categories

Subscribe

Sign up for our Newsletter

Fill out my online form.