The concrete has been poured and framing has begun on this addition.
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/1-framing.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/2-flashing-and-drainage-prep.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/3-vaulted-ceiling-framed.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/4-garage-with-waterproofing.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/5-roofing.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/6-subfloor-2nd-floor.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/7-sheething.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/8-chimney-framed-and-sheethed.jpg)
The concrete has been poured and framing has begun on this addition.