We have T&G going in as well as tile. Windows and doors are getting trimmed out and the drywall is being completed.
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/1-TG-cedar-shingles.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/2-tile-surround.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/3-tile-combo.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/4-window-trim.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/5-barnwood-wall.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/6-fireplace-prepped-for-stonework.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/7-door-trim.jpg)
![](https://phillipsbrothersinc.com/wp-content/uploads/2022/04/8-hvac-units.jpg)
We have T&G going in as well as tile. Windows and doors are getting trimmed out and the drywall is being completed.
Address
109 Railroad Street Hartwell, GA 30643
© 2024 Phillips Brothers Contracting Inc. All Rights Reserved. Admin Login. Powered by ShiftWeb. Privacy Policy