We’ve got roofing and shingles going on, the exterior is getting both cedar shake and board and baton siding as well as the exterior glass doors getting installed. Beams for the porch and basement have been put in along with the fireplace too.

The water proofing and ice shield have gone onto the roof in preparation for the shingles.
The basement fireplace has been installed and will receive stone and a mantle.
The back porch is having french doors installed.
The roof is having shingles installed now.
The upper portion of the home is having cedar shake installed.
The exterior of the house is having board and baton siding installed onto it.
The large cedar beams and posts are being installed on the porch.
The basement also has cedar beams and posts being installed.