Dobbs Landing-Hartwell-2

This addition is coming along beautifully. The drywall is up and ready to be painted. Tile has been installed on floors and in the bathroom showers. On the exterior siding has gone up and is being stained.

Drywall has gone up, been muded, taped, and sanded. It’s ready to be painted.
We’re hanging the cedar siding in an angled design.
The siding is all hung and ready to be stained. The angled design is fantastic.
The flooring is a tile that looks like hardwood.
The finished tile flooring is now all sealed and looks beautiful.
The shower tile has been installed. The varying shades add dimension and texture.
The cedar siding is being stained.
The grey brick tile is laid in a herringbone pattern.

Leave a Comment

Your email address will not be published. Required fields are marked *

Recent Posts

Archives

Categories

Subscribe

Sign up for our Newsletter

Fill out my online form.