This addition is coming along beautifully. The drywall is up and ready to be painted. Tile has been installed on floors and in the bathroom showers. On the exterior siding has gone up and is being stained.








This addition is coming along beautifully. The drywall is up and ready to be painted. Tile has been installed on floors and in the bathroom showers. On the exterior siding has gone up and is being stained.
Address
109 Railroad Street Hartwell, GA 30643
© 2025 Phillips Brothers Contracting Inc. All Rights Reserved. Admin Login. Powered by ShiftWeb. Privacy Policy