The basement is all framed with the floor for the main level above. The main level framing is going up and you can see the house taking shape. The layout is apparent and next up will be the loft level with roofing going on.
Tammerick-Hartwell-6
Recent Posts
Lightwood-Hartwell-5
March 31, 2020
Creating a Home vol 122
March 25, 2020
Lightwood 2-Hartwell-1
March 24, 2020