The framing is almost complete and the cabinetry is being drawn on the subfloor to ensure that everything will be in the proper place for plumbing and electrical.
Tammerick-Hartwell-9
Recent Posts
Lightwood-Hartwell-5
March 31, 2020
Creating a Home vol 122
March 25, 2020
Lightwood 2-Hartwell-1
March 24, 2020