The new addition is coming along nicely.

This shows the rough in plumbing for beneath the slab foundation that we will pour next.
The slab foundation has been poured.
We’ve begun framing the basement level.
The interior walls are framed and the floor system is being framed for the level above .
The second level is being framed now.
The interior walls for the second level are being framed.
The exterior walls have sheeting and the holes for the windows and doors have been cut out.
The view from the rear showcases even more of the scale of the addition.

Leave a Comment

Your email address will not be published. Required fields are marked *

Subscribe

Sign up for our Newsletter

Fill out my online form.