We’re adjusting the driveway and parking area by grading more of the area around them and altering the steepness of the land. Foundations have been poured and now the basement is being framed out and septic lines run. It’s really starting to come together.

 

20180129_163048
The parking area and driveway are having gravel poured to help stabilize them and make them usable during the build process.
20180130_112550
The foundation has been poured and you can see the rough plumbing and rebar coming through it.
20180212_142358
You can see the septic tank lids and the basement framing beginning.
20180213_141152
Even with the rain that we had the basement framing shows the view that they’ll have from here.
20180213_141251
You can see part of the poured walls and foundation that were framing the basement out on top of.

[wpvideo PCzRHbhb]

Prep for the foundation to be poured, you can see the poured walls and mesh grid with the rebar and rough plumbing all set for the concrete.

[wpvideo aJYvLpjU]

The septic system is in a three-step configuration to fit the size of the house and the grading of the site.

[wpvideo nNm9ZQRS]

You get to walk around the site and see how the grading of the driveway and parking are laid out.