The house is getting more stonework on the exterior and the chimney. The steel arches are being raised into place. The beams are being stained and the electrical installed.

1-continueing stonework
The home continues to get more stone installed.
2-electrical
The electrical boxes are going in.
3-tub install
The tub is now being installed.
4-staining the beams
All the previously installed beams are getting stained before they are wrapped to protect them from the sheet rock that will soon be going in.
5-steel arches
The steel arches are being raised into place.
6-stone for the chimney
The chimney is receiving its stonework.
7-electrical
The electrical boxes for the exterior are installed as well.
8-Exterior trim delivery
The exterior trim is being delivered.