The drywall is fully installed and has been primed and painted. Cabinetry, railings for the deck, tile and stone on the fireplaces are being installed. This house is getting the finishing touches that make it a home.








The drywall is fully installed and has been primed and painted. Cabinetry, railings for the deck, tile and stone on the fireplaces are being installed. This house is getting the finishing touches that make it a home.
Address
109 Railroad Street Hartwell, GA 30643
© 2025 Phillips Brothers Contracting Inc. All Rights Reserved. Admin Login. Powered by ShiftWeb. Privacy Policy