This home is getting electrical, plumbing and gas lines all run. More cedar shake, siding and board & batton siding are being installed. The pool is receiving attention as well.

The sides of the home are receiving board & batton siding all completed by hand.
Above the garage doors we’ve built an overhang supported by corbels.
The front porch has gotten siding and the cedar shake is gorgeous.
Newly run electrical wires and plumbing lines are being shown here.
The back porch is getting siding installed.
This photo shows a tub being fitted into place before the walls get sheetrock.
Gas lines have also been run into the home.
The pool is having plumbing for filters run into it.

Leave a Comment

Your email address will not be published. Required fields are marked *

Subscribe

Sign up for our Newsletter

Fill out my online form.