The house has footers poured now. We’re adding gravel for equipment. Digging for septic install to run the rough plumbing and to really start to see a home taking shape. The footers show us where support walls will be and the rough plumbing lake kitchens, laundry rooms and baths. Can you envision this house yet?

20180216_171200
We’re evening out the gravel to give parking areas for the equipment being used onsite.
20180222_124725
You can see the guys smoothing the concrete for the footers to ensure that it dries evenly and properly.
20180222_164215
More stone that we dug up has been added to the walls being created with it for the property.
20180222_164237
The footers show the footprint of the house along with the poured walls already in place.
20180222_164239
More of the houses footprint being shown.
20180223_140945
Installing the septic tank.

[wpvideo 3Od9BPaq]

A walk around the property to see what it all looks like and identifying where everything is going.

BT_1519501563183
The plumbing being connected to and from the septic tank.

Leave a Comment

Your email address will not be published. Required fields are marked *

Subscribe

Sign up for our Newsletter

Fill out my online form.