We’re framing, pouring patios, working on roofs and cedar shake. The structure is coming along very nicely.

The second level is being framed and sheathing is wrapping the exterior walls.
The concrete patio has been poured, so spacious!
The detached garage is getting its roof put on.
The home is having its roof framed out and put on as well.
The windows are being installed with zip tape surrounding to keep out water.
The house is still receiving more windows and other framing is ongoing.
The garage has a complete shingled roof now.
The exterior of the garage is having cedar shake installed.

Leave a Comment

Your email address will not be published. Required fields are marked *

Subscribe

Sign up for our Newsletter

Fill out my online form.