The house is almost ready for the finishing touches that really take it from construction to home. HVAC, electrical and plumbing are installed. The siding is in place along with columns awaiting stone.

20171228_134521
The HVAC is being installed.
BT_1515184293464
Electrical is being run throughout the home.
BT_1515184347417
Plumbing is run and ready to be connected.
IMG_8599.HEIC
The HVAC has all the vents and exchanges in place.
IMG_8648.HEIC
Can lights are installed.
IMG_8730.HEIC
The front entry is all framed out and has siding.
IMG_8731.HEIC
The exterior is getting the siding all the way around in preparation for the stone to go below.
IMG_8732.HEIC
The columns are in place and awaiting stone as well.

Leave a Comment

Your email address will not be published. Required fields are marked *

Subscribe

Sign up for our Newsletter

Fill out my online form.