The walls have drywall that’s now prepped for painting. We’ve installed both electrical and HVAC. The exterior has siding, wood trim and cedar shake. The home is looking almost complete on the exterior and the interior is almost ready to begin the install of cabinetry.

IMG_8463.HEIC
The drywall is going up.
IMG_8533.HEIC
The guys hanging siding on the garage.
IMG_8535.HEIC
All the windows are installed and trimmed out. The exterior trim work is getting finished.
IMG_8609.HEIC
The guys are putting up cedar shake.
IMG_8612.HEIC
The drywall is now all up and all the seams are taped, sheet rock mud has been applied and sanded in preparation for paint.
IMG_8648.HEIC
Can lights are being hung while the electrical install is going on.
IMG_8651.HEIC
The HVAC in the attic.
IMG_8702.HEIC
The completed garage with siding, cedar shake and garage doors.