Category: Keowee
Little Lightwood-Hartwell-7
April 3, 2018
No Comments
The roof is going on now along with installing windows. The exterior trim is also starting to go up.
Read More →
Timberbrook-Keowee-7
March 27, 2018
No Comments
The poured walls are all waterproofed and set. We've got rough-in plumbing all run and we've back-filled the entire area with earth.
Read More →
Rippling Cove-Keowee-7
March 20, 2018
No Comments
Framing of the basement and burying of the septic tanks has given the landscape a finished look. The views are spectacular.
Read More →
Tammerick-Hartwell-6
March 13, 2018
No Comments
The basement is all framed with the floor for the main level above. The main level framing is going up and you can see the ...
Read More →
Little Lightwood-Hartwell-6
March 6, 2018
No Comments
The second story is taking shape. Framing and exterior walls are almost finished
Read More →
Timberbrook-Keowee-6
February 27, 2018
No Comments
This site is really starting to become a home construction area
Read More →
Rippling Cove-Keowee-6
February 20, 2018
No Comments
Foundations have been poured and now the basement is being framed out and septic lines run. It's really starting to come together.
Read More →
Tammerick-Hartwell-5
February 13, 2018
No Comments
You can see all the walls, doorways and window placement for the basement.
Read More →
Little Lightwood-Hartwell-5
February 6, 2018
No Comments
You can start to see the layout of the different rooms and the locations of the doors and windows.
Read More →
Timberbrook-Keowee-5
January 30, 2018
No Comments
This site had tons of large rocks that are now being put to use in creating walls to assist with soil retention while looking very ...
Read More →