Category: Keowee

Little Lightwood-Hartwell-7

The roof is going on now along with installing windows. The exterior trim is also starting to go up.
Read More →

Timberbrook-Keowee-7

The poured walls are all waterproofed and set. We've got rough-in plumbing all run and we've back-filled the entire area with earth.
Read More →

Rippling Cove-Keowee-7

Framing of the basement and burying of the septic tanks has given the landscape a finished look. The views are spectacular.
Read More →

Tammerick-Hartwell-6

The basement is all framed with the floor for the main level above. The main level framing is going up and you can see the ...
Read More →

Little Lightwood-Hartwell-6

The second story is taking shape. Framing and exterior walls are almost finished
Read More →

Timberbrook-Keowee-6

This site is really starting to become a home construction area
Read More →

Rippling Cove-Keowee-6

Foundations have been poured and now the basement is being framed out and septic lines run. It's really starting to come together.
Read More →

Tammerick-Hartwell-5

You can see all the walls, doorways and window placement for the basement.
Read More →

Little Lightwood-Hartwell-5

You can start to see the layout of the different rooms and the locations of the doors and windows.
Read More →

Timberbrook-Keowee-5

This site had tons of large rocks that are now being put to use in creating walls to assist with soil retention while looking very ...
Read More →
Subscribe

Sign up for our Newsletter

Fill out my online form.