Author: admin@sws

Tammerick-Hartwell-7

The main level is getting framed now.
Read More →

Little Lightwood-Hartwell-7

The roof is going on now along with installing windows. The exterior trim is also starting to go up.
Read More →

Timberbrook-Keowee-7

The poured walls are all waterproofed and set. We've got rough-in plumbing all run and we've back-filled the entire area with earth.
Read More →

Creating a Home vol 23

Volume 23 of great spaces in our homes.
Read More →

Rippling Cove-Keowee-7

Framing of the basement and burying of the septic tanks has given the landscape a finished look. The views are spectacular.
Read More →

Creating a Home vol 22

Volume 22 of great spaces in our homes.
Read More →

Tammerick-Hartwell-6

The basement is all framed with the floor for the main level above. The main level framing is going up and you can see the ...
Read More →

Creating a Home vol 21

Volume 21 of great spaces in our homes.
Read More →

Little Lightwood-Hartwell-6

The second story is taking shape. Framing and exterior walls are almost finished
Read More →

Creating a Home vol 20

Volume 20 of great spaces in our homes.
Read More →
Subscribe

Sign up for our Newsletter

Fill out my online form.