Author: admin@sws
Creating a Home vol 118
Volume 118 of great spaces in our homes.
Rue Cezzan-Hartwell-4
The addition is getting insulation, drywall, paint and more stone for the exterior.
Creating a Home vol 117
Volume 117 of great spaces in our homes.
Rippling Cove-Keowee-31 Final
This is the final look at this home we’re all finished and it’s ready for the owners to move in.
Creating a Home vol 116
Volume 116 of great spaces in our homes.
Katelynn-Hartwell-7
We have T&G going in as well as tile. Windows and doors are getting trimmed out and the drywall is being completed.
Creating a Home vol 115
Volume 115 of great spaces in our homes.
Lightwood-Hartwell-3
The rain and cold have kept us a bit slow on this addition but we’ve got footers poured and are prepped for the slabs to be poured as soon as the weather is both dry and warmer. You can’t pour concrete when it’s too cold or it won’t set up correctly.
Creating a Home vol 114
Volume 114 of great spaces in our homes.
Rue Cezzan-Hartwell-3
The addition is becoming a true part of this home.