Blog

Rippling Cove-Keowee-8

Rippling Cove-Keowee-8

We’re working on the final framing of the basement with white oak timbers being delivered and trimmed for install. The main level will be started soon. 

Tammerick-Hartwell-6

Tammerick-Hartwell-6

The basement is all framed with the floor for the main level above. The main level framing is going up and you can see the house taking shape.